Non-temperature dependent load arrangements Working Group

An inactive working group of the Market Advisory Committee
Last updated:

This group was nominated by MAC at its meeting on 12 September 2007. The Working Group鈥檚 scope of work included consideration and assessment of the definitions and treatment of Non-Temperature Dependent Loads (NTDLs) in the Reserve Capacity Mechanism, and the development of any necessary changes to the WEM Rules. The Working Group delivered its report in the form of a rule change discussion paper at the MAC meeting on 14 December 2007.

Sidebar
Was this page useful?